# Construction Analytics: Job Cost and WIP | Storek

> Ask about job costs, WIP, change orders and RFIs in plain English. Every answer shows its working; crew and owner contact details stay private.

Source: https://storek.io/solutions/construction

For contractors, project controllers and field ops

# Know which jobs are over budget — and why.

Bring your job-cost exports, pay apps and change-order logs. Ask about WIP, cost-code drift and schedule risk in plain English, and get answers with the working shown. Crew and owner contact details stay private.

[Book a demo ](https://storek.io/demo?industry=construction)[Take the tour](https://storek.io/tour)

Speaks your language

WIPjob costingcost codeschange ordersRFIsover/under billingpercent completeretainagecost to complete

Ask · Harbor & Pine BuildersLive

Which active jobs are trending over budget?

4 of 23 active jobs are projected over budget, counting actual plus committed cost against the current budget. Riverside Medical Office is furthest out at **$214,600** over.

 Worked out from your data

Who

Project controller

When

Monday, 8:40 — the owner wants WIP by job before the 9:00 meeting.

Delivered

A trusted answer, before the meeting starts

Sound familiar?

“I find out a job is upside-down when the month closes. By then the concrete's poured.”

Ask 'which jobs are trending over budget?' on any day of the month, and see exactly how the answer was worked out.

“The WIP schedule lives in one spreadsheet, and one person knows how to update it.”

Set it up once and your WIP schedule keeps itself current every time new job costs arrive. Nobody re-links anything.

“Change orders sit in someone's inbox for six weeks, and we end up eating the cost.”

Pending change orders land on one shared list, so PMs work the same list and approvals flow straight into your dashboards.

Three questions, answered

## Asked in plain English. Every answer shows its working.

“Which active jobs are trending over budget?”

4 of 23 active jobs are projected over budget, counting actual plus committed cost against the current budget. Riverside Medical Office is furthest out at **$214,600** over.

 See how it was worked out

-   matched cost codes to their jobs
-   kept only active jobs
-   added actual plus committed cost against the current budget for each job
-   kept the jobs that come out over, largest gap first

“Where are we underbilled on WIP this month?”

Five active jobs are underbilled by a combined $187,400 — work done but not yet billed. Canal Warehouse is the largest at **$118,200**: 71% complete by cost, only 58% billed.

 See how it was worked out

-   matched pay applications to their jobs
-   kept only active jobs
-   compared work done, by percent complete, with what has been billed
-   kept the underbilled jobs, largest first

“Do rain days explain our slipped concrete pours?”

Across 412 pours since March, 47% slipped in weeks with 4 or more rain days, against 9% in dry weeks (public weather data matched to each job site). Pad the pour schedule in wet weeks before you blame the crews.

 See how it was worked out

-   matched each concrete pour to its job site's weather for that week
-   grouped pours by how many rain days that week had
-   compared the share of pours that slipped in each group

Ask once

## Then it stays answered.

Ask once and keep the answer working: a live dashboard that updates itself, a table your team can review line by line, and a branded report for the next meeting, all showing the same trusted numbers.

Dashboard**Operations — Monday WIP review**Harbor & Pine BuildersRefreshed Mon 06:00 · v12 · history

Backlog (unbilled contract)

**$38.4M**+6.1%

Jobs over budget

**4 of 23**

Underbilling by job*AI edited*

Cost to complete, top 5 jobs

Cost-code variance by job

Change orders pending over 30 days

AI edited 1 tile · 5 untouched tiles restored exactly

No weekly re-upload. When new data arrives, every chart, table and report above updates itself. [Why not just use an AI chat? →](https://storek.io/why-storek)

Table · review**Change orders to review**

Change orderJobAmountStatus

CO-118 · storm drain tie-inCanal Warehouse$42,750*Open*

CO-121 · owner finish upgradeRiverside Medical Office$18,300*Review*

CO-109 · unforeseen rock excavationLakeview School Annex$67,900*Accepted*

CO-124 · door hardware swap (RFI 212)Elm St. Townhomes$6,480*In progress*

Your columns: **notes + a formula**Publish approved rows → dataset

Report

Monthly WIP & margin review — Harbor & Pine Builders

Executive summary

1.  Executive summary
2.  WIP schedule and underbilling
3.  Jobs over budget by cost code
4.  Change orders and RFIs outstanding
5.  How the numbers were worked out

Appendix · every query + row count

[See a sample report →](https://storek.io/resources)

What teams use it for

01

### Spot cost-code drift before month-end

Compare actual and committed cost to budget by cost code every time new costs arrive, so an overrun shows up in week two, not at close.

02

### One WIP schedule everyone trusts

Percent complete and over/under billing are defined once, so the owner, the PMs and the surety see the same number.

03

### Work change orders and RFIs as a list

Pending change orders and open RFIs sit on one shared list with statuses and notes.

04

### Put public data beside your jobs (Business and up)

Add public building permits, construction prices and weather in one click, then ask how they lined up with your margins.

Private by default

## Crew, owner and sub data stays private

Job files carry crew phone numbers, owner contacts, tax IDs and payroll details. Storek masks them automatically, while your cost math keeps working.

[How Storek protects data →](https://storek.io/security)

-   Labor cost by job stays correct without showing anyone's personal details.
-   You choose who sees what: payroll can see a worker's details, the PM can't.

For the whole buying team

Project controller or CFO (champion)

WIP, underbilling and cost to complete on demand, with the working beside every number, ready to hand the owner, the bank or the surety.

IT or operations systems lead

Bring your existing exports with no ERP rework, nothing to install or maintain, and single sign-on on Business and up.

Owner or leadership

A Monday dashboard of margin fade, backlog and jobs at risk, plus a report in your brand.

Built on public data · Public data, on Business and up**Permits, prices, weather**

Put public building permits, construction prices and weather beside your own jobs in one click, and see what's really moving your margins.

Book a demo

## Book a demo with construction sample data

30 minutes. Your data or our sample. No slide deck. Pick a time straight after the form.

Other industries

[Financial services](https://storek.io/solutions/financial-services)[Healthcare ops](https://storek.io/solutions/healthcare-life-sciences)[Manufacturing](https://storek.io/solutions/manufacturing-supply-chain)[SaaS & CS](https://storek.io/solutions/saas-customer-success)[Agencies & partners](https://storek.io/solutions/agencies-partners)[Retail & e-commerce](https://storek.io/solutions/retail-ecommerce)[Public sector & education](https://storek.io/solutions/public-sector-education)
